Post-Construction Cleanup
Once contractors pack up, a layer of drywall dust, adhesive residue, paint overspray, and sticker film coats every surface in the building. Ranger Janitorial post-construction cleanup teams in handle the full transition — from rough-out debris hauling to final-touch polishing — so your space is client-ready on schedule.
- Rough-out phase: debris removal, broom sweeping, and trash hauling
- Final-phase: detailed dust wipe-down of all surfaces and fixtures
- Window and glass cleaning to remove construction film and labels
- Hard-floor polishing and carpet vacuuming or extraction
- Restroom fixture scrubbing and tile grout cleaning
- Certificate of occupancy punch-list coordination available
Frequently asked questions
How many visits does a post-construction cleanup require?
Most projects need two visits: a rough-out clean once construction ends, followed by a final detail clean 24–48 hours later after settling dust is wiped away.
Do you remove construction debris and dumpster hauls?
Ranger Janitorial coordinates debris removal during the rough-out phase; large dumpster hauls are arranged through our preferred waste partners and quoted separately.
Can you match a general contractor's punch-list schedule?
Yes — we coordinate directly with GCs and project managers to hit deadline milestones and issue a completion sign-off you can attach to your occupancy file.