Post-Construction Cleanup

Once contractors pack up, a layer of drywall dust, adhesive residue, paint overspray, and sticker film coats every surface in the building. Ranger Janitorial post-construction cleanup teams in handle the full transition — from rough-out debris hauling to final-touch polishing — so your space is client-ready on schedule.

  • Rough-out phase: debris removal, broom sweeping, and trash hauling
  • Final-phase: detailed dust wipe-down of all surfaces and fixtures
  • Window and glass cleaning to remove construction film and labels
  • Hard-floor polishing and carpet vacuuming or extraction
  • Restroom fixture scrubbing and tile grout cleaning
  • Certificate of occupancy punch-list coordination available

Frequently asked questions

How many visits does a post-construction cleanup require?

Most projects need two visits: a rough-out clean once construction ends, followed by a final detail clean 24–48 hours later after settling dust is wiped away.

Do you remove construction debris and dumpster hauls?

Ranger Janitorial coordinates debris removal during the rough-out phase; large dumpster hauls are arranged through our preferred waste partners and quoted separately.

Can you match a general contractor's punch-list schedule?

Yes — we coordinate directly with GCs and project managers to hit deadline milestones and issue a completion sign-off you can attach to your occupancy file.